Installation of meeting rooms and toilet blocks, and an expansion off existing camp by installing an additional 10 buildings for Minesite Camp at Bald Hill. Preparation works including supply and installation of concrete landing blocks. Landing of buildings and setup of internal fixtures & furniture. Installation of air conditioning units. Supply & installation of building tie downs. Patio works for breezeways between buildings. Forming, placing and finishing of concrete foot paths in front of laundry and shower blocks as well as connecting footpaths between various buildings.